Other info concerning Energy Performance Certificate:
In 2003, a new condensing boiler (Buderus) was installed for the building. Then a floor heating system was reinstalled (see photo) for the ground floor. The actual energy consumption of the practice can to be examined on request from the billing (2012 approx 14,000 kWh for heating and hot water). The practice rooms are heated at 24 degrees Celsius for the treatments, with underfloor heating.