The summer of 2026 was, in parts, extreme. Climate change can no longer be ignored. Its effects necessitate a rethink in construction and refurbishment. For decades, buildings in Germany have been optimised to protect against the cold in winter. Since the heatwave of summer 2026, protection against overheating must also be given greater consideration. 


Heat is like an earthquake – except that its destructive potential remains largely invisible. It does not leave behind collapsed houses. And yet, according to estimates by the Robert Koch Institute (RKI), it claimed 14,000 lives between calendar weeks 15 and 32 in 2026 – more than in the summers of 2024 and 2025 combined.


Hot summers are just one consequence of climate change. Flooding and heavy rainfall are causing damage to buildings, roads and technical infrastructure with increasing frequency. Whilst flood defences along major rivers have been continuously expanded, the risks posed by heavy rainfall, smaller watercourses and local drainage systems are increasingly coming into focus. This is shown by a new study from the Federal Institute for Research on Building, Urban Affairs and Spatial Development (BBSR).


Since the summer of 2026, the opposite of flooding – namely the extremely low water levels in major rivers – has shown that climate change is bringing about changes that must be addressed at a fundamental level. Researchers at the Technical University of Berlin point out that water is becoming an increasingly pressing issue for the future in Berlin and Brandenburg. How can groundwater reserves be protected? What strategies can help to avoid conflicts over water use, water scarcity or even rationing during periods of drought?


This therefore raises new questions for property owners who wish to build, convert or renovate. According to the Federal Environment Agency, the building sector in Germany is responsible for around 30 to 35 per cent of greenhouse gas emissions and final energy consumption. This makes it one of the largest sources of greenhouse gas emissions, alongside transport and industry. By 2045, the entire building stock in Germany is set to be fully climate-neutral. However, the current rate of refurbishment of existing buildings is considered too low to achieve these targets. 


Photo: © Rüdiger Manig, German Weather Service, 2026 (illustrative image, Authentic Image)


Your feedback

The information you send us via this form is 100% encrypted using modern encryption standards.

Privacy Policy

By submitting I agree to the processing of my data. I can revoke my consent at any time to AllGrund Immobilien GmbH via e-mail to service (at) allgrund.com . Further information on the processing of your data can be found in our privacy policy.

Please mark the following checkbox to confirm.

I have read and agreed to the Privacy Policy.

Right of Withdrawal

You have the right to withdraw a brokers contract within fourteen days without giving any reason.  In order to exercise your right  you must write to AllGrund Immobilien GmbH, Immanuel-Kant-Str. 35, 63303 Dreieich, Fax-No: +49 6103 8073755, or emailto: widerruf (at) allgrund.de. See also the explanations regarding the right of withdrawal here. 

Please mark the following checkbox to confirm.

I have read and understood the Right of Withdrawal Policy.